अवसंरचना नाज़ुकता सूचकांक
Index of transport and digital connectivity deficits, utility fragility, energy supply unreliability and realised disruption impact on a 0–10 scale, higher meaning more fragile.
geometric
expert weights · floor 0.1 where geometric
1,000 draws
normalisation, weights, aggregation, imputation
5 components
24 leaf indicators
67% minimum
modelled share ≤ 30%
From indicators to the composite
Shows how likely infrastructure is to fail or isolate people under stress, and how much it already has; sub-indices stay visible beside the total.
- बारहमासी सड़क के 2 km के भीतर ग्रामीण जनसंख्याIndicator · IND · %Share of the rural population living within two kilometres (about a 20-minute walk) of a road passable in all seasons, estimated from gridded population and road-network condition data.
- लॉजिस्टिक्स प्रदर्शनIndicator · IND · scoreOverall score of trade logistics performance (customs, infrastructure, shipments, logistics competence, tracking, timeliness) on a 1–5 scale, as an external source series.
- अग्रणी स्तर के सापेक्ष लाइनर शिपिंग कनेक्टिविटीIndicator · IND · %Liner shipping connectivity of the economy’s ports (ship deployment, container capacity, services, companies, direct connections) as a percentage of the highest-scoring economy in the same year.
- प्रति व्यक्ति वहन किए गए हवाई यात्रीIndicator · IND · passengers/a/personPassengers carried on domestic and international flights by carriers registered in the economy, per resident per year.
- सार्वजनिक परिवहन तक सुविधाजनक पहुँच वाली शहरी जनसंख्याIndicator · IND · %Share of the urban population living within 500 m walking distance of a low-capacity public transport stop or 1 km of a high-capacity one.
- इंटरनेट का उपयोग करने वाले व्यक्तिIndicator · IND · %Share of individuals who used the Internet from any location and device in the last three months.
- मोबाइल नेटवर्क से आच्छादित जनसंख्या, तकनीक के अनुसारIndicator · IND · %Share of the population within range of a mobile-cellular signal, reported separately for 2G, 3G, 4G/LTE and 5G; the headline value is 4G or better.
- प्रति 100 निवासी फ़िक्स्ड ब्रॉडबैंड सदस्यताएँIndicator · IND · /10*2Fixed subscriptions to the public Internet at advertised download speeds of at least 256 kbit/s, per 100 inhabitants, by speed tier.
- अंतरराष्ट्रीय कनेक्टिविटी मार्ग अतिरेकताIndicator · IND · 1Number of physically diverse international connectivity routes (distinct subsea-cable landing stations and cross-border terrestrial fibre routes) serving the economy, capped at ten.
- पावर ग्रिड का लचीलापनIndicator · IND · scoreTarget-defined score (0–1) combining transmission N-1 compliance, share of demand restorable within 24 hours after a major event, black-start capability and hardening of critical substations against flood, wind, heat and geomagnetic stress.
- जल आपूर्ति नेटवर्क का लचीलापनIndicator · IND · scoreTarget-defined score (0–1) combining non-revenue water, storage in days of average demand, source redundancy, back-up power at treatment and pumping sites, and planned restoration time after a major event.
- 72-घंटे बैक-अप बिजली वाली महत्वपूर्ण सुविधाएँIndicator · IND · %Share of hospitals, emergency operations centres, water and wastewater plants and telecom core sites with on-site back-up power and fuel for at least 72 hours of operation.
- अवसंरचना निवेश अंतर, GDP का हिस्साIndicator · IND · %Difference between the estimated annual investment needed to meet infrastructure service and resilience needs (energy, transport, water, telecom) and current-trend investment, as a percentage of GDP.
- सामान्य महीने में फ़र्मों द्वारा झेली गई बिजली कटौतीIndicator · IND · /moAverage number of electrical outages that formal private firms report in a typical month, from establishment surveys.
- बिजली कटौती से हुई मूल्य हानि, फ़र्म बिक्री का हिस्साIndicator · IND · %Losses that firms attribute to power outages as a percentage of annual sales, from establishment surveys.
- प्रणाली औसत व्यवधान अवधि (SAIDI)Indicator · IND · h/aTotal minutes of sustained supply interruption per customer served in the year, expressed in hours, as reported by distribution utilities under the IEEE 1366 convention.
- प्रणाली औसत व्यवधान आवृत्ति (SAIFI)Indicator · IND · /aNumber of sustained supply interruptions per customer served in the year, as reported by distribution utilities under the IEEE 1366 convention.
- विद्युत पारेषण और वितरण हानियाँIndicator · IND · %Electricity lost between generation and the consumer, technical and commercial, as a share of electricity output.
- आपदाओं से क्षतिग्रस्त या नष्ट महत्वपूर्ण अवसंरचना इकाइयाँIndicator · IND · 1Number of critical infrastructure units and facilities (health, education, transport, utilities, other) damaged or destroyed by hazardous events in the year.
- आपदाओं से क्षतिग्रस्त या नष्ट स्वास्थ्य सुविधाएँIndicator · IND · 1Number of health facilities damaged or destroyed by hazardous events in the year.
- आपदाओं से क्षतिग्रस्त या नष्ट शैक्षिक सुविधाएँIndicator · IND · 1Number of educational facilities damaged or destroyed by hazardous events in the year.
- आपदाओं के कारण बुनियादी सेवाओं में व्यवधानIndicator · IND · 1Number of disruption events to basic services (education, health, and other basic services such as water, power, transport, telecom and waste) caused by hazardous events in the year.
- महत्वपूर्ण अवसंरचना को प्रत्यक्ष आर्थिक हानि, GDP का हिस्साIndicator · IND · %Direct economic loss from damage to or destruction of critical infrastructure by hazardous events in the year, as a percentage of GDP.
- राष्ट्रीय स्तर पर इंटरनेट व्यवधान के घंटेIndicator · IND · h/aTotal hours in the year during which measured national internet connectivity fell below half of its expected level, whether from shutdowns, cable cuts, power loss or attack.
- Transport connectivity deficit sub-indexSub-index · SUB · w 1 · 22.2%Composite of the lack of rural all-season road access, weak logistics performance, low liner shipping connectivity, low air connectivity and limited urban public transport, each inverted.
- Digital connectivity deficit sub-indexSub-index · SUB · w 1 · 22.2%Composite of the lack of internet use, mobile coverage, fixed broadband and international route redundancy, each inverted.
- Utility system fragility sub-indexSub-index · SUB · w 1 · 22.2%Composite of the lack of power-grid and water-network resilience and of back-up power at critical facilities, together with the infrastructure investment gap.
- Electricity supply unreliability sub-indexSub-index · SUB · w 1 · 22.2%Composite of firm-reported outages and sales losses, SAIDI, SAIFI and network losses.
- Infrastructure disruption impact sub-indexSub-index · SUB · w 0.5 · 11.1%Composite of disaster damage to critical infrastructure, health and education facilities, basic-service disruptions, economic loss to infrastructure and internet disruption hours, normalised over a ten-year rolling window.
- अवसंरचना नाज़ुकता सूचकांकDomain index · IDX · geometricIndex of transport and digital connectivity deficits, utility fragility, energy supply unreliability and realised disruption impact on a 0–10 scale, higher meaning more fragile.
- मानव और प्रणाली भेद्यताPillar · PILLAR · 8 indicesHow susceptible are people, livelihoods, ecosystems and essential systems to harm when a shock arrives?
- NXS-GRX (canonical data, provenance and risk) Composite RiskComposite · COMPOSITE · four pillarsComposite = (HTE × VUL × MSF × LCC)^(1/4), each pillar on 0–10 floored at 0.1; pillar = expert-weighted geometric mean of its domain indices
Run this index’s own aggregation
Set each component, change the aggregation or the weight uncertainty, and watch the interval, the class probability and each component’s contribution respond.
Treatment, normalisation, weighting, aggregation, uncertainty
- Treatment
- WINSORISE
- Outlier rule
- |skew| > 2, kurtosis > 3.5
- Normalisation
- INFORM 0–10 rescaling
- Imputation
- NONE
- Coverage minimum
- 67% of components
- Modelled share cap
- 30% of weight
- Weighting
- विशेषज्ञ
- Aggregation
- geometric
- Scale
- 0 to 10
- अनिश्चितता
- 1,000 Monte Carlo runs over normalisation, weights, aggregation, imputation
- Framework basis
- OECD/JRC Handbook (2008); JRC COIN 10-step guide; Sendai Framework target D; UNDRR Principles for Resilient Infrastructure (2022)
5 components, 24 indicators
Transport connectivity deficit sub-index w 1
Composite of the lack of rural all-season road access, weak logistics performance, low liner shipping connectivity, low air connectivity and limited urban public transport, each inverted.
| संकेतक | इकाई | साक्ष्य | स्रोत | हिस्सा |
|---|---|---|---|---|
बारहमासी सड़क के 2 km के भीतर ग्रामीण जनसंख्याIND.INF.transport.rural_road_access | % | Class C | wb-rural-access-index, openstreetmap, worldpop | 33.3% |
लॉजिस्टिक्स प्रदर्शनIND.INF.transport.logistics_performance | {score} | Class E | wb-lpi | 22.2% |
अग्रणी स्तर के सापेक्ष लाइनर शिपिंग कनेक्टिविटीIND.INF.transport.liner_shipping_connectivity | % | Class B | unctad-lsci, wb-wdi | 22.2% |
प्रति व्यक्ति वहन किए गए हवाई यात्रीIND.INF.transport.air_passengers.pc | {passengers}/a/{person} | Class B | icao-air-transport-reporting, wb-wdi | 11.1% |
सार्वजनिक परिवहन तक सुविधाजनक पहुँच वाली शहरी जनसंख्याIND.INF.transport.public_transport_access | % | Class C | un-habitat-urban-indicators-database, gtfs-feeds, openstreetmap | 11.1% |
Digital connectivity deficit sub-index w 1
Composite of the lack of internet use, mobile coverage, fixed broadband and international route redundancy, each inverted.
| संकेतक | इकाई | साक्ष्य | स्रोत | हिस्सा |
|---|---|---|---|---|
इंटरनेट का उपयोग करने वाले व्यक्तिIND.INF.digital.internet_users | % | Class B | itu-datahub, wb-wdi, national-ict-household-surveys | 33.3% |
मोबाइल नेटवर्क से आच्छादित जनसंख्या, तकनीक के अनुसारIND.INF.digital.mobile_network_coverage | % | Class B | itu-datahub, gsma-mobile-coverage-maps | 33.3% |
प्रति 100 निवासी फ़िक्स्ड ब्रॉडबैंड सदस्यताएँIND.INF.digital.fixed_broadband | /10*2 | Class B | itu-datahub, wb-wdi, oecd-broadband-portal | 16.7% |
अंतरराष्ट्रीय कनेक्टिविटी मार्ग अतिरेकताIND.INF.digital.international_connectivity_redundancy | 1 | Class D | telegeography-submarine-cable-map, itu-broadband-maps, peeringdb | 16.7% |
Utility system fragility sub-index w 1
Composite of the lack of power-grid and water-network resilience and of back-up power at critical facilities, together with the infrastructure investment gap.
| संकेतक | इकाई | साक्ष्य | स्रोत | हिस्सा |
|---|---|---|---|---|
पावर ग्रिड का लचीलापनIND.INF.utilities.power_grid_resilience | {score} | Class D | national-energy-regulators, transmission-system-operator-reports, entso-e-transparency | 25.0% |
जल आपूर्ति नेटवर्क का लचीलापनIND.INF.utilities.water_network_resilience | {score} | Class E | ibnet-water-utility-database, national-water-regulators, municipal-utility-reports | 25.0% |
72-घंटे बैक-अप बिजली वाली महत्वपूर्ण सुविधाएँIND.INF.utilities.critical_facility_backup_power | % | Class E | who-health-facility-assessments, national-civil-protection-inspections | 25.0% |
अवसंरचना निवेश अंतर, GDP का हिस्साIND.INF.utilities.infrastructure_investment_gap.gdp | % | Class C | gi-hub-infrastructure-outlook, wb-ppi-database, imf-investment-and-capital-stock-dataset | 25.0% |
Electricity supply unreliability sub-index w 1
Composite of firm-reported outages and sales losses, SAIDI, SAIFI and network losses.
| संकेतक | इकाई | साक्ष्य | स्रोत | हिस्सा |
|---|---|---|---|---|
सामान्य महीने में फ़र्मों द्वारा झेली गई बिजली कटौतीIND.ENE.reliability.firm_power_outages | /mo | Class B | wb-enterprise-surveys, wb-b-ready | 22.2% |
बिजली कटौती से हुई मूल्य हानि, फ़र्म बिक्री का हिस्साIND.ENE.reliability.outage_sales_loss | % | Class B | wb-enterprise-surveys | 22.2% |
प्रणाली औसत व्यवधान अवधि (SAIDI)IND.ENE.reliability.saidi | h/a | Class B | wb-b-ready, national-energy-regulators, ceer-benchmarking-report, us-eia-861 | 22.2% |
प्रणाली औसत व्यवधान आवृत्ति (SAIFI)IND.ENE.reliability.saifi | /a | Class B | wb-b-ready, national-energy-regulators, ceer-benchmarking-report, us-eia-861 | 22.2% |
विद्युत पारेषण और वितरण हानियाँIND.ENE.reliability.td_losses | % | Class B | iea-electricity-information, national-energy-regulators, wb-wdi | 11.1% |
Infrastructure disruption impact sub-index w 0.5
Composite of disaster damage to critical infrastructure, health and education facilities, basic-service disruptions, economic loss to infrastructure and internet disruption hours, normalised over a ten-year rolling window.
| संकेतक | इकाई | साक्ष्य | स्रोत | हिस्सा |
|---|---|---|---|---|
आपदाओं से क्षतिग्रस्त या नष्ट महत्वपूर्ण अवसंरचना इकाइयाँIND.INF.disruption.critical_infrastructure_damage | 1 | Class B | undrr-sendai-framework-monitor, desinventar | 22.2% |
आपदाओं से क्षतिग्रस्त या नष्ट स्वास्थ्य सुविधाएँIND.INF.disruption.health_facilities_damaged | 1 | Class B | undrr-sendai-framework-monitor, who-health-resources-availability-monitoring | 11.1% |
आपदाओं से क्षतिग्रस्त या नष्ट शैक्षिक सुविधाएँIND.INF.disruption.education_facilities_damaged | 1 | Class B | undrr-sendai-framework-monitor, gadrrres-comprehensive-school-safety | 11.1% |
आपदाओं के कारण बुनियादी सेवाओं में व्यवधानIND.INF.disruption.basic_service_disruptions | 1 | Class C | undrr-sendai-framework-monitor | 22.2% |
महत्वपूर्ण अवसंरचना को प्रत्यक्ष आर्थिक हानि, GDP का हिस्साIND.INF.disruption.critical_infrastructure_loss.gdp | % | Class C | undrr-sendai-framework-monitor, wb-gfdrr-pdna-reports | 22.2% |
राष्ट्रीय स्तर पर इंटरनेट व्यवधान के घंटेIND.INF.digital.internet_disruption_hours | h/a | Class D | ioda-georgia-tech, cloudflare-radar, access-now-keepiton | 11.1% |
अवसंरचना
Critical infrastructure stock, condition, service continuity, connectivity and urban systems.
| Sub-domain | संकेतक |
|---|---|
| Transport | 6 |
| Digital connectivity | 5 |
| Utilities | 7 |
| Urban systems | 1 |
| Service disruption | 5 |
Anchor frameworks (pillar structure and definitions only): Sendai D; ISO 37120 / 37122 / 37123.
All 24 infrastructure indicators
| संकेतक | क्षेत्र | Sub-domain | घटक | इकाई | स्तर | Crosswalks |
|---|---|---|---|---|---|---|
बारहमासी सड़क के 2 km के भीतर ग्रामीण जनसंख्याIND.INF.transport.rural_road_access | INF | Transport | coping capacity | % | COUNTRY, ADM1 | SDG 9.1.1 |
लॉजिस्टिक्स प्रदर्शनIND.INF.transport.logistics_performance | INF | Transport | coping capacity | {score} | COUNTRY | WB_WDI LP.LPI.OVRL.XQ |
अग्रणी स्तर के सापेक्ष लाइनर शिपिंग कनेक्टिविटीIND.INF.transport.liner_shipping_connectivity | INF | Transport | coping capacity | % | COUNTRY | WB_WDI IS.SHP.GCNW.XQ |
प्रति व्यक्ति वहन किए गए हवाई यात्रीIND.INF.transport.air_passengers.pc | INF | Transport | coping capacity | {passengers}/a/{person} | COUNTRY | WB_WDI IS.AIR.PSGR |
सार्वजनिक परिवहन तक सुविधाजनक पहुँच वाली शहरी जनसंख्याIND.INF.transport.public_transport_access | INF | Transport | coping capacity | % | CITY, ADM1, COUNTRY | SDG 11.2.1 ISO_37120 ISO 37120:2018 |
उच्च-संकट क्षेत्रों में सड़क और रेल नेटवर्क, हिस्साIND.INF.transport.network_exposed.share | INF | Transport | exposure | % | COUNTRY, ADM1, ADM2, CITY, GRID | |
इंटरनेट का उपयोग करने वाले व्यक्तिIND.INF.digital.internet_users | INF | Digital connectivity | coping capacity | % | COUNTRY, ADM1, CITY | SDG 17.8.1 WB_WDI IT.NET.USER.ZS |
मोबाइल नेटवर्क से आच्छादित जनसंख्या, तकनीक के अनुसारIND.INF.digital.mobile_network_coverage | INF | Digital connectivity | coping capacity | % | COUNTRY, ADM1 | SDG 9.c.1 |
प्रति 100 निवासी फ़िक्स्ड ब्रॉडबैंड सदस्यताएँIND.INF.digital.fixed_broadband | INF | Digital connectivity | coping capacity | /10*2 | COUNTRY, ADM1 | SDG 17.6.1 WB_WDI IT.NET.BBND.P2 |
अंतरराष्ट्रीय कनेक्टिविटी मार्ग अतिरेकताIND.INF.digital.international_connectivity_redundancy | INF | Digital connectivity | coping capacity | 1 | COUNTRY | |
राष्ट्रीय स्तर पर इंटरनेट व्यवधान के घंटेIND.INF.digital.internet_disruption_hours | INF | Digital connectivity | impact | h/a | COUNTRY | |
पावर ग्रिड का लचीलापनIND.INF.utilities.power_grid_resilience | INF | Utilities | coping capacity | {score} | COUNTRY, ADM1, CITY | ISO_37123 ISO 37123:2019 |
जल आपूर्ति नेटवर्क का लचीलापनIND.INF.utilities.water_network_resilience | INF | Utilities | coping capacity | {score} | COUNTRY, ADM1, CITY | ISO_37123 ISO 37123:2019 |
72-घंटे बैक-अप बिजली वाली महत्वपूर्ण सुविधाएँIND.INF.utilities.critical_facility_backup_power | INF | Utilities | coping capacity | % | COUNTRY, ADM1, CITY | ISO_37123 ISO 37123:2019 |
उच्च-संकट क्षेत्रों में जल आपूर्ति परिसंपत्तियाँ, हिस्साIND.INF.utilities.water_assets_exposed.share | INF | Utilities | exposure | % | COUNTRY, ADM1, ADM2, CITY, GRID | |
उच्च-संकट क्षेत्रों में बिजली उत्पादन और ग्रिड परिसंपत्तियाँ, हिस्साIND.INF.utilities.power_assets_exposed.share | INF | Utilities | exposure | % | COUNTRY, ADM1, ADM2, CITY, GRID | |
उच्च-संकट क्षेत्रों में जीवनरेखा सुविधाएँ, हिस्साIND.INF.utilities.lifeline_facilities_exposed.share | INF | Utilities | exposure | % | COUNTRY, ADM1, ADM2, CITY, GRID | |
अवसंरचना निवेश अंतर, GDP का हिस्साIND.INF.utilities.infrastructure_investment_gap.gdp | INF | Utilities | vulnerability | % | COUNTRY | |
City electricity interruption hours per customerIND.INF.urban.power_interruption_hours | INF | Urban systems | vulnerability | h/a | CITY | ISO_37120 ISO 37120:2018 |
आपदाओं से क्षतिग्रस्त या नष्ट महत्वपूर्ण अवसंरचना इकाइयाँIND.INF.disruption.critical_infrastructure_damage | INF | Service disruption | impact | 1 | COUNTRY, ADM1 | SENDAI D-1 SDG 11.5.2 |
आपदाओं से क्षतिग्रस्त या नष्ट स्वास्थ्य सुविधाएँIND.INF.disruption.health_facilities_damaged | INF | Service disruption | impact | 1 | COUNTRY, ADM1 | SENDAI D-2 |
आपदाओं से क्षतिग्रस्त या नष्ट शैक्षिक सुविधाएँIND.INF.disruption.education_facilities_damaged | INF | Service disruption | impact | 1 | COUNTRY, ADM1 | SENDAI D-3 |
आपदाओं के कारण बुनियादी सेवाओं में व्यवधानIND.INF.disruption.basic_service_disruptions | INF | Service disruption | impact | 1 | COUNTRY, ADM1 | SENDAI D-5 |
महत्वपूर्ण अवसंरचना को प्रत्यक्ष आर्थिक हानि, GDP का हिस्साIND.INF.disruption.critical_infrastructure_loss.gdp | INF | Service disruption | impact | % | COUNTRY, ADM1 | SENDAI C-5 |
Infrastructure fragility index, world
The world reading of this index, every country as a tile and the largest movements since the previous edition.
- पिछला संस्करण
- –
- Range since 2016
- –
- युग्मित समग्र
- –
- युग्मन अंक S
- –
- पल्स, नवीनतम सप्ताह
- –
- Outlook, 12 months
- –
- पद्धति
- Indicator Standard 1.0 · NXS-GRX 2026
- ड्रॉ
- 1,000
अभी कोई जारी मान नहीं। पहला संस्करण यहाँ अपने अंतराल पट्टी और वर्ग सीमाओं के साथ इतिहास खींचता है।
Country values
- टाइलें
/api/v1/public/grix/risk-products/tiles/inf/{z}/{x}/{y}.mvt- अवलोकन कुंजी
nis:IDX.INF.disruption.infrastructure_fragility:{ISO3}:{YEAR}:A
Series that read this index
Crosswalks and validity checks
Crosswalks map leaf indicators to source code lists; established indices are used for validity checks, never re-weighted as inputs.
| Code system | Leaf indicators mapped |
|---|---|
WB_WDI | 8 |
SDG | 6 |
SENDAI | 5 |
ISO_37120 | 3 |
ISO_37123 | 3 |
Platforms, standards and ways to take part
Field and service platforms of GCRI, GRF and GRA, the Nexus Risk Standards for this domain, learning, working groups and open calls. Every link is a live page.
उद्धरण और पुनः उपयोग
See this index in every country profile
Each profile shows this index with its interval and class once released.
स्थिति
The Global Risks Index की पद्धति, संरचना और परिभाषाएँ एक प्रारंभिक कार्यकारी मसौदा (2026) हैं, जो समीक्षा और टिप्पणी के लिए परिचालित हैं, कार्यान्वयन के लिए नहीं। किसी शासित साक्ष्य कटौती से संस्करण जारी होने तक कोई मान प्रकट नहीं होता; तब मानों के साथ अंतराल, वर्ग, स्रोत और उनका सुधार मार्ग होता है। सिम्युलेटर आपके चुने हुए अंकों पर प्रकाशित पद्धतियाँ चलाते हैं और कभी कोई NXS-GRX मान नहीं दिखाते।
NXS-GRX क्या नहीं है
NXS-GRX अनुसंधान और जोखिम-विश्लेषण की सूचना है। यह क्रेडिट या ESG रेटिंग नहीं है और किसी रेटिंग पैमाने का उपयोग नहीं करता। यह वित्तीय लिखतों का बेंचमार्क नहीं है, आधिकारिक सांख्यिकी नहीं है, आपातकालीन चेतावनी या आधिकारिक वर्गीकरण नहीं है और सलाह नहीं है। इसका उपयोग प्राकृतिक व्यक्तियों के मूल्यांकन के लिए नहीं किया जाना चाहिए। जोखिम वर्ग प्रकाशित पैमाने के बैंड हैं, देशों या व्यक्तियों की रैंकिंग कभी नहीं।
संस्थान और स्रोत
The Nexus Consortium is stewarded by three independent not-for-profit institutions: The Global Centre for Risk and Innovation (GCRI), through GCRI US in Washington, DC and GCRI Canada in Ontario, with GCRI Canada as Lead Institution, Consortium Secretariat and lead contracting organisation; The Global Risks Forum (GRF); and The Global Risks Alliance (GRA). Technology, infrastructure and service providers work with the Consortium at arm’s length under written agreements, like every other external party in the public-private-planet model, and hold no role in its stewardship.
प्रत्येक मान के साथ उसके स्रोतों का श्रेय होता है, जो अपने लाइसेंस बनाए रखते हैं। बाहरी नाम केवल अंतरसंचालनीयता के लिए उद्धृत किए गए हैं। Nexus द्वारा लिखित पाठ जारी होने पर CC BY 4.0 के अंतर्गत होना अभिप्रेत है।
Avis en français
La méthodologie et les définitions du NXS-GRX sont un projet de travail préparatoire (2026). Le NXS-GRX est une information de recherche et d’analyse des risques : ni notation, ni indice de référence financier, ni statistique officielle, ni alerte, ni conseil. Les classes de risque sont des bandes sur une échelle publiée, non des classements.