مؤشر هشاشة البنية التحتية
Index of transport and digital connectivity deficits, utility fragility, energy supply unreliability and realised disruption impact on a 0–10 scale, higher meaning more fragile.
geometric
expert weights · floor 0.1 where geometric
1,000 draws
normalisation, weights, aggregation, imputation
5 components
24 leaf indicators
67% minimum
modelled share ≤ 30%
From indicators to the composite
Shows how likely infrastructure is to fail or isolate people under stress, and how much it already has; sub-indices stay visible beside the total.
- سكان الريف على بعد 2 كم من طريق صالح في جميع الفصولIndicator · IND · %Share of the rural population living within two kilometres (about a 20-minute walk) of a road passable in all seasons, estimated from gridded population and road-network condition data.
- الأداء اللوجستيIndicator · IND · scoreOverall score of trade logistics performance (customs, infrastructure, shipments, logistics competence, tracking, timeliness) on a 1–5 scale, as an external source series.
- الربط بخطوط الشحن المنتظمة مقارنةً بالحد الأعلىIndicator · IND · %Liner shipping connectivity of the economy’s ports (ship deployment, container capacity, services, companies, direct connections) as a percentage of the highest-scoring economy in the same year.
- ركاب النقل الجوي للفردIndicator · IND · passengers/a/personPassengers carried on domestic and international flights by carriers registered in the economy, per resident per year.
- سكان المدن الذين تتوفر لهم إمكانية وصول ملائمة إلى النقل العامIndicator · IND · %Share of the urban population living within 500 m walking distance of a low-capacity public transport stop or 1 km of a high-capacity one.
- الأفراد الذين يستخدمون الإنترنتIndicator · IND · %Share of individuals who used the Internet from any location and device in the last three months.
- السكان المشمولون بشبكة اتصالات متنقلة، حسب التقنيةIndicator · IND · %Share of the population within range of a mobile-cellular signal, reported separately for 2G, 3G, 4G/LTE and 5G; the headline value is 4G or better.
- اشتراكات النطاق العريض الثابت لكل 100 نسمةIndicator · IND · /10*2Fixed subscriptions to the public Internet at advertised download speeds of at least 256 kbit/s, per 100 inhabitants, by speed tier.
- تعدد مسارات الربط الدوليIndicator · IND · 1Number of physically diverse international connectivity routes (distinct subsea-cable landing stations and cross-border terrestrial fibre routes) serving the economy, capped at ten.
- الصمود في شبكة الكهرباءIndicator · IND · scoreTarget-defined score (0–1) combining transmission N-1 compliance, share of demand restorable within 24 hours after a major event, black-start capability and hardening of critical substations against flood, wind, heat and geomagnetic stress.
- الصمود في شبكة الإمداد بالمياهIndicator · IND · scoreTarget-defined score (0–1) combining non-revenue water, storage in days of average demand, source redundancy, back-up power at treatment and pumping sites, and planned restoration time after a major event.
- المرافق الحيوية المزودة بطاقة احتياطية لمدة 72 ساعةIndicator · IND · %Share of hospitals, emergency operations centres, water and wastewater plants and telecom core sites with on-site back-up power and fuel for at least 72 hours of operation.
- فجوة الاستثمار في البنية التحتية، نسبةً إلى الناتج المحلي الإجماليIndicator · IND · %Difference between the estimated annual investment needed to meet infrastructure service and resilience needs (energy, transport, water, telecom) and current-trend investment, as a percentage of GDP.
- انقطاعات الكهرباء التي تتعرض لها الشركات في شهر عاديIndicator · IND · /moAverage number of electrical outages that formal private firms report in a typical month, from establishment surveys.
- القيمة المفقودة بسبب انقطاعات الكهرباء، نسبةً إلى مبيعات الشركاتIndicator · IND · %Losses that firms attribute to power outages as a percentage of annual sales, from establishment surveys.
- متوسط مدة انقطاع النظام (SAIDI)Indicator · IND · h/aTotal minutes of sustained supply interruption per customer served in the year, expressed in hours, as reported by distribution utilities under the IEEE 1366 convention.
- متوسط تواتر انقطاع النظام (SAIFI)Indicator · IND · /aNumber of sustained supply interruptions per customer served in the year, as reported by distribution utilities under the IEEE 1366 convention.
- فاقد نقل الطاقة الكهربائية وتوزيعهاIndicator · IND · %Electricity lost between generation and the consumer, technical and commercial, as a share of electricity output.
- وحدات البنية التحتية الحيوية المتضررة أو المدمرة بفعل الكوارثIndicator · IND · 1Number of critical infrastructure units and facilities (health, education, transport, utilities, other) damaged or destroyed by hazardous events in the year.
- المرافق الصحية المتضررة أو المدمرة بفعل الكوارثIndicator · IND · 1Number of health facilities damaged or destroyed by hazardous events in the year.
- المرافق التعليمية المتضررة أو المدمرة بفعل الكوارثIndicator · IND · 1Number of educational facilities damaged or destroyed by hazardous events in the year.
- اضطرابات الخدمات الأساسية المنسوبة إلى الكوارثIndicator · IND · 1Number of disruption events to basic services (education, health, and other basic services such as water, power, transport, telecom and waste) caused by hazardous events in the year.
- الخسارة الاقتصادية المباشرة في البنية التحتية الحيوية، نسبةً إلى الناتج المحلي الإجماليIndicator · IND · %Direct economic loss from damage to or destruction of critical infrastructure by hazardous events in the year, as a percentage of GDP.
- ساعات انقطاع الإنترنت على المستوى الوطنيIndicator · IND · h/aTotal hours in the year during which measured national internet connectivity fell below half of its expected level, whether from shutdowns, cable cuts, power loss or attack.
- Transport connectivity deficit sub-indexSub-index · SUB · w 1 · 22.2%Composite of the lack of rural all-season road access, weak logistics performance, low liner shipping connectivity, low air connectivity and limited urban public transport, each inverted.
- Digital connectivity deficit sub-indexSub-index · SUB · w 1 · 22.2%Composite of the lack of internet use, mobile coverage, fixed broadband and international route redundancy, each inverted.
- Utility system fragility sub-indexSub-index · SUB · w 1 · 22.2%Composite of the lack of power-grid and water-network resilience and of back-up power at critical facilities, together with the infrastructure investment gap.
- Electricity supply unreliability sub-indexSub-index · SUB · w 1 · 22.2%Composite of firm-reported outages and sales losses, SAIDI, SAIFI and network losses.
- Infrastructure disruption impact sub-indexSub-index · SUB · w 0.5 · 11.1%Composite of disaster damage to critical infrastructure, health and education facilities, basic-service disruptions, economic loss to infrastructure and internet disruption hours, normalised over a ten-year rolling window.
- مؤشر هشاشة البنية التحتيةDomain index · IDX · geometricIndex of transport and digital connectivity deficits, utility fragility, energy supply unreliability and realised disruption impact on a 0–10 scale, higher meaning more fragile.
- هشاشة البشر والنظمPillar · PILLAR · 8 indicesHow susceptible are people, livelihoods, ecosystems and essential systems to harm when a shock arrives?
- NXS-GRX (canonical data, provenance and risk) Composite RiskComposite · COMPOSITE · four pillarsComposite = (HTE × VUL × MSF × LCC)^(1/4), each pillar on 0–10 floored at 0.1; pillar = expert-weighted geometric mean of its domain indices
Run this index’s own aggregation
Set each component, change the aggregation or the weight uncertainty, and watch the interval, the class probability and each component’s contribution respond.
Treatment, normalisation, weighting, aggregation, uncertainty
- Treatment
- WINSORISE
- Outlier rule
- |skew| > 2, kurtosis > 3.5
- التطبيع
- INFORM 0–10 rescaling
- Imputation
- NONE
- Coverage minimum
- 67% of components
- Modelled share cap
- 30% of weight
- Weighting
- خبير
- Aggregation
- geometric
- Scale
- 0 to 10
- عدم اليقين
- 1,000 Monte Carlo runs over normalisation, weights, aggregation, imputation
- Framework basis
- OECD/JRC Handbook (2008); JRC COIN 10-step guide; Sendai Framework target D; UNDRR Principles for Resilient Infrastructure (2022)
5 components, 24 indicators
Transport connectivity deficit sub-index w 1
Composite of the lack of rural all-season road access, weak logistics performance, low liner shipping connectivity, low air connectivity and limited urban public transport, each inverted.
| المؤشر | الوحدة | الأدلة | المصادر | الحصة |
|---|---|---|---|---|
سكان الريف على بعد 2 كم من طريق صالح في جميع الفصولIND.INF.transport.rural_road_access | % | Class C | wb-rural-access-index, openstreetmap, worldpop | 33.3% |
الأداء اللوجستيIND.INF.transport.logistics_performance | {score} | Class E | wb-lpi | 22.2% |
الربط بخطوط الشحن المنتظمة مقارنةً بالحد الأعلىIND.INF.transport.liner_shipping_connectivity | % | Class B | unctad-lsci, wb-wdi | 22.2% |
ركاب النقل الجوي للفردIND.INF.transport.air_passengers.pc | {passengers}/a/{person} | Class B | icao-air-transport-reporting, wb-wdi | 11.1% |
سكان المدن الذين تتوفر لهم إمكانية وصول ملائمة إلى النقل العامIND.INF.transport.public_transport_access | % | Class C | un-habitat-urban-indicators-database, gtfs-feeds, openstreetmap | 11.1% |
Digital connectivity deficit sub-index w 1
Composite of the lack of internet use, mobile coverage, fixed broadband and international route redundancy, each inverted.
| المؤشر | الوحدة | الأدلة | المصادر | الحصة |
|---|---|---|---|---|
الأفراد الذين يستخدمون الإنترنتIND.INF.digital.internet_users | % | Class B | itu-datahub, wb-wdi, national-ict-household-surveys | 33.3% |
السكان المشمولون بشبكة اتصالات متنقلة، حسب التقنيةIND.INF.digital.mobile_network_coverage | % | Class B | itu-datahub, gsma-mobile-coverage-maps | 33.3% |
اشتراكات النطاق العريض الثابت لكل 100 نسمةIND.INF.digital.fixed_broadband | /10*2 | Class B | itu-datahub, wb-wdi, oecd-broadband-portal | 16.7% |
تعدد مسارات الربط الدوليIND.INF.digital.international_connectivity_redundancy | 1 | Class D | telegeography-submarine-cable-map, itu-broadband-maps, peeringdb | 16.7% |
Utility system fragility sub-index w 1
Composite of the lack of power-grid and water-network resilience and of back-up power at critical facilities, together with the infrastructure investment gap.
| المؤشر | الوحدة | الأدلة | المصادر | الحصة |
|---|---|---|---|---|
الصمود في شبكة الكهرباءIND.INF.utilities.power_grid_resilience | {score} | Class D | national-energy-regulators, transmission-system-operator-reports, entso-e-transparency | 25.0% |
الصمود في شبكة الإمداد بالمياهIND.INF.utilities.water_network_resilience | {score} | Class E | ibnet-water-utility-database, national-water-regulators, municipal-utility-reports | 25.0% |
المرافق الحيوية المزودة بطاقة احتياطية لمدة 72 ساعةIND.INF.utilities.critical_facility_backup_power | % | Class E | who-health-facility-assessments, national-civil-protection-inspections | 25.0% |
فجوة الاستثمار في البنية التحتية، نسبةً إلى الناتج المحلي الإجماليIND.INF.utilities.infrastructure_investment_gap.gdp | % | Class C | gi-hub-infrastructure-outlook, wb-ppi-database, imf-investment-and-capital-stock-dataset | 25.0% |
Electricity supply unreliability sub-index w 1
Composite of firm-reported outages and sales losses, SAIDI, SAIFI and network losses.
| المؤشر | الوحدة | الأدلة | المصادر | الحصة |
|---|---|---|---|---|
انقطاعات الكهرباء التي تتعرض لها الشركات في شهر عاديIND.ENE.reliability.firm_power_outages | /mo | Class B | wb-enterprise-surveys, wb-b-ready | 22.2% |
القيمة المفقودة بسبب انقطاعات الكهرباء، نسبةً إلى مبيعات الشركاتIND.ENE.reliability.outage_sales_loss | % | Class B | wb-enterprise-surveys | 22.2% |
متوسط مدة انقطاع النظام (SAIDI)IND.ENE.reliability.saidi | h/a | Class B | wb-b-ready, national-energy-regulators, ceer-benchmarking-report, us-eia-861 | 22.2% |
متوسط تواتر انقطاع النظام (SAIFI)IND.ENE.reliability.saifi | /a | Class B | wb-b-ready, national-energy-regulators, ceer-benchmarking-report, us-eia-861 | 22.2% |
فاقد نقل الطاقة الكهربائية وتوزيعهاIND.ENE.reliability.td_losses | % | Class B | iea-electricity-information, national-energy-regulators, wb-wdi | 11.1% |
Infrastructure disruption impact sub-index w 0.5
Composite of disaster damage to critical infrastructure, health and education facilities, basic-service disruptions, economic loss to infrastructure and internet disruption hours, normalised over a ten-year rolling window.
| المؤشر | الوحدة | الأدلة | المصادر | الحصة |
|---|---|---|---|---|
وحدات البنية التحتية الحيوية المتضررة أو المدمرة بفعل الكوارثIND.INF.disruption.critical_infrastructure_damage | 1 | Class B | undrr-sendai-framework-monitor, desinventar | 22.2% |
المرافق الصحية المتضررة أو المدمرة بفعل الكوارثIND.INF.disruption.health_facilities_damaged | 1 | Class B | undrr-sendai-framework-monitor, who-health-resources-availability-monitoring | 11.1% |
المرافق التعليمية المتضررة أو المدمرة بفعل الكوارثIND.INF.disruption.education_facilities_damaged | 1 | Class B | undrr-sendai-framework-monitor, gadrrres-comprehensive-school-safety | 11.1% |
اضطرابات الخدمات الأساسية المنسوبة إلى الكوارثIND.INF.disruption.basic_service_disruptions | 1 | Class C | undrr-sendai-framework-monitor | 22.2% |
الخسارة الاقتصادية المباشرة في البنية التحتية الحيوية، نسبةً إلى الناتج المحلي الإجماليIND.INF.disruption.critical_infrastructure_loss.gdp | % | Class C | undrr-sendai-framework-monitor, wb-gfdrr-pdna-reports | 22.2% |
ساعات انقطاع الإنترنت على المستوى الوطنيIND.INF.digital.internet_disruption_hours | h/a | Class D | ioda-georgia-tech, cloudflare-radar, access-now-keepiton | 11.1% |
البنية التحتية
Critical infrastructure stock, condition, service continuity, connectivity and urban systems.
| Sub-domain | المؤشرات الفرعية |
|---|---|
| النقل | 6 |
| Digital connectivity | 5 |
| Utilities | 7 |
| Urban systems | 1 |
| Service disruption | 5 |
Anchor frameworks (pillar structure and definitions only): Sendai D; ISO 37120 / 37122 / 37123.
All 24 infrastructure indicators
| المؤشر | المجال | Sub-domain | المكوّن | الوحدة | المستويات | Crosswalks |
|---|---|---|---|---|---|---|
سكان الريف على بعد 2 كم من طريق صالح في جميع الفصولIND.INF.transport.rural_road_access | INF | النقل | القدرة على المواجهة | % | COUNTRY, ADM1 | SDG 9.1.1 |
الأداء اللوجستيIND.INF.transport.logistics_performance | INF | النقل | القدرة على المواجهة | {score} | COUNTRY | WB_WDI LP.LPI.OVRL.XQ |
الربط بخطوط الشحن المنتظمة مقارنةً بالحد الأعلىIND.INF.transport.liner_shipping_connectivity | INF | النقل | القدرة على المواجهة | % | COUNTRY | WB_WDI IS.SHP.GCNW.XQ |
ركاب النقل الجوي للفردIND.INF.transport.air_passengers.pc | INF | النقل | القدرة على المواجهة | {passengers}/a/{person} | COUNTRY | WB_WDI IS.AIR.PSGR |
سكان المدن الذين تتوفر لهم إمكانية وصول ملائمة إلى النقل العامIND.INF.transport.public_transport_access | INF | النقل | القدرة على المواجهة | % | CITY, ADM1, COUNTRY | SDG 11.2.1 ISO_37120 ISO 37120:2018 |
شبكة الطرق والسكك الحديدية في المناطق شديدة الخطر، النسبةIND.INF.transport.network_exposed.share | INF | النقل | التعرض | % | COUNTRY, ADM1, ADM2, CITY, GRID | |
الأفراد الذين يستخدمون الإنترنتIND.INF.digital.internet_users | INF | Digital connectivity | القدرة على المواجهة | % | COUNTRY, ADM1, CITY | SDG 17.8.1 WB_WDI IT.NET.USER.ZS |
السكان المشمولون بشبكة اتصالات متنقلة، حسب التقنيةIND.INF.digital.mobile_network_coverage | INF | Digital connectivity | القدرة على المواجهة | % | COUNTRY, ADM1 | SDG 9.c.1 |
اشتراكات النطاق العريض الثابت لكل 100 نسمةIND.INF.digital.fixed_broadband | INF | Digital connectivity | القدرة على المواجهة | /10*2 | COUNTRY, ADM1 | SDG 17.6.1 WB_WDI IT.NET.BBND.P2 |
تعدد مسارات الربط الدوليIND.INF.digital.international_connectivity_redundancy | INF | Digital connectivity | القدرة على المواجهة | 1 | COUNTRY | |
ساعات انقطاع الإنترنت على المستوى الوطنيIND.INF.digital.internet_disruption_hours | INF | Digital connectivity | impact | h/a | COUNTRY | |
الصمود في شبكة الكهرباءIND.INF.utilities.power_grid_resilience | INF | Utilities | القدرة على المواجهة | {score} | COUNTRY, ADM1, CITY | ISO_37123 ISO 37123:2019 |
الصمود في شبكة الإمداد بالمياهIND.INF.utilities.water_network_resilience | INF | Utilities | القدرة على المواجهة | {score} | COUNTRY, ADM1, CITY | ISO_37123 ISO 37123:2019 |
المرافق الحيوية المزودة بطاقة احتياطية لمدة 72 ساعةIND.INF.utilities.critical_facility_backup_power | INF | Utilities | القدرة على المواجهة | % | COUNTRY, ADM1, CITY | ISO_37123 ISO 37123:2019 |
أصول الإمداد بالمياه في المناطق شديدة الخطر، النسبةIND.INF.utilities.water_assets_exposed.share | INF | Utilities | التعرض | % | COUNTRY, ADM1, ADM2, CITY, GRID | |
أصول توليد الكهرباء والشبكة في المناطق شديدة الخطر، النسبةIND.INF.utilities.power_assets_exposed.share | INF | Utilities | التعرض | % | COUNTRY, ADM1, ADM2, CITY, GRID | |
مرافق شريان الحياة في المناطق شديدة الخطر، النسبةIND.INF.utilities.lifeline_facilities_exposed.share | INF | Utilities | التعرض | % | COUNTRY, ADM1, ADM2, CITY, GRID | |
فجوة الاستثمار في البنية التحتية، نسبةً إلى الناتج المحلي الإجماليIND.INF.utilities.infrastructure_investment_gap.gdp | INF | Utilities | vulnerability | % | COUNTRY | |
City electricity interruption hours per customerIND.INF.urban.power_interruption_hours | INF | Urban systems | vulnerability | h/a | CITY | ISO_37120 ISO 37120:2018 |
وحدات البنية التحتية الحيوية المتضررة أو المدمرة بفعل الكوارثIND.INF.disruption.critical_infrastructure_damage | INF | Service disruption | impact | 1 | COUNTRY, ADM1 | SENDAI D-1 SDG 11.5.2 |
المرافق الصحية المتضررة أو المدمرة بفعل الكوارثIND.INF.disruption.health_facilities_damaged | INF | Service disruption | impact | 1 | COUNTRY, ADM1 | SENDAI D-2 |
المرافق التعليمية المتضررة أو المدمرة بفعل الكوارثIND.INF.disruption.education_facilities_damaged | INF | Service disruption | impact | 1 | COUNTRY, ADM1 | SENDAI D-3 |
اضطرابات الخدمات الأساسية المنسوبة إلى الكوارثIND.INF.disruption.basic_service_disruptions | INF | Service disruption | impact | 1 | COUNTRY, ADM1 | SENDAI D-5 |
الخسارة الاقتصادية المباشرة في البنية التحتية الحيوية، نسبةً إلى الناتج المحلي الإجماليIND.INF.disruption.critical_infrastructure_loss.gdp | INF | Service disruption | impact | % | COUNTRY, ADM1 | SENDAI C-5 |
Infrastructure fragility index, world
The world reading of this index, every country as a tile and the largest movements since the previous edition.
- الطبعة السابقة
- –
- Range since 2016
- –
- المركب المترابط
- –
- درجة الترابط S
- –
- Pulse، الأسبوع الأخير
- –
- Outlook, 12 months
- –
- المنهجية
- Indicator Standard 1.0 · NXS-GRX 2026
- السحوبات
- 1,000
لا قيم صادرة بعد. ترسم الطبعة الأولى السجل التاريخي هنا مع نطاق الفترة وحدود الفئات.
Country values
- البلاطات
/api/v1/public/grix/risk-products/tiles/inf/{z}/{x}/{y}.mvt- مفتاح الرصد
nis:IDX.INF.disruption.infrastructure_fragility:{ISO3}:{YEAR}:A
Series that read this index
Crosswalks and validity checks
Crosswalks map leaf indicators to source code lists; established indices are used for validity checks, never re-weighted as inputs.
| Code system | Leaf indicators mapped |
|---|---|
WB_WDI | 8 |
SDG | 6 |
SENDAI | 5 |
ISO_37120 | 3 |
ISO_37123 | 3 |
Platforms, standards and ways to take part
Field and service platforms of GCRI, GRF and GRA, the Nexus Risk Standards for this domain, learning, working groups and open calls. Every link is a live page.
الاستشهاد وإعادة الاستخدام
See this index in every country profile
Each profile shows this index with its interval and class once released.
الحالة
منهجية The Global Risks Index وبنيته وتعاريفه مسودة عمل تحضيرية (2026)، تُعمَّم للمراجعة والتعليق لا للتطبيق. ولا تظهر أي قيمة إلى أن يصدر إصدار من مقطع أدلة خاضع للحوكمة؛ وعندئذ تحمل القيم فترات وفئات ومصادر ومسار تصويبها. وتُطبِّق أدوات المحاكاة المنهجيات المنشورة على أرقام تختارها أنت، ولا تعرض أبدًا أي قيمة من NXS-GRX.
ما ليس عليه NXS-GRX
NXS-GRX معلومات بحثية وتحليلية للمخاطر. وهو ليس تصنيفًا ائتمانيًا ولا تصنيفًا بيئيًا واجتماعيًا وحوكميًا ولا يستخدم أي مقياس تصنيف، وليس مؤشرًا مرجعيًا للأدوات المالية، ولا إحصاءً رسميًا، ولا إنذارًا طارئًا أو تصنيفًا رسميًا، ولا مشورة. ولا يجوز استخدامه لتقييم الأشخاص الطبيعيين. فئات المخاطر نطاقات على مقياس منشور، وليست أبدًا ترتيبًا للبلدان أو الأشخاص.
المؤسسات والمصادر
The Nexus Consortium is stewarded by three independent not-for-profit institutions: The Global Centre for Risk and Innovation (GCRI), through GCRI US in Washington, DC and GCRI Canada in Ontario, with GCRI Canada as Lead Institution, Consortium Secretariat and lead contracting organisation; The Global Risks Forum (GRF); and The Global Risks Alliance (GRA). Technology, infrastructure and service providers work with the Consortium at arm’s length under written agreements, like every other external party in the public-private-planet model, and hold no role in its stewardship.
تحمل كل قيمة إسناد مصادرها، التي تحتفظ بتراخيصها الخاصة. ولا يُستشهد بالأسماء الخارجية إلا لأغراض قابلية التشغيل البيني. ويُعتزم إصدار النصوص التي تؤلفها Nexus بموجب ترخيص CC BY 4.0 عند نشرها.
Avis en français
La méthodologie et les définitions du NXS-GRX sont un projet de travail préparatoire (2026). Le NXS-GRX est une information de recherche et d’analyse des risques : ni notation, ni indice de référence financier, ni statistique officielle, ni alerte, ni conseil. Les classes de risque sont des bandes sur une échelle publiée, non des classements.