Indeks kerapuhan infrastruktur
Index of transport and digital connectivity deficits, utility fragility, energy supply unreliability and realised disruption impact on a 0–10 scale, higher meaning more fragile.
geometric
expert weights · floor 0.1 where geometric
1,000 draws
normalisation, weights, aggregation, imputation
5 components
24 leaf indicators
67% minimum
modelled share ≤ 30%
From indicators to the composite
Shows how likely infrastructure is to fail or isolate people under stress, and how much it already has; sub-indices stay visible beside the total.
- Penduduk perdesaan dalam jarak 2 km dari jalan segala musimIndicator · IND · %Share of the rural population living within two kilometres (about a 20-minute walk) of a road passable in all seasons, estimated from gridded population and road-network condition data.
- Kinerja logistikIndicator · IND · scoreOverall score of trade logistics performance (customs, infrastructure, shipments, logistics competence, tracking, timeliness) on a 1–5 scale, as an external source series.
- Konektivitas pelayaran reguler relatif terhadap batas terbaikIndicator · IND · %Liner shipping connectivity of the economy’s ports (ship deployment, container capacity, services, companies, direct connections) as a percentage of the highest-scoring economy in the same year.
- Penumpang udara yang diangkut per kapitaIndicator · IND · passengers/a/personPassengers carried on domestic and international flights by carriers registered in the economy, per resident per year.
- Penduduk perkotaan dengan akses mudah ke transportasi umumIndicator · IND · %Share of the urban population living within 500 m walking distance of a low-capacity public transport stop or 1 km of a high-capacity one.
- Individu yang menggunakan internetIndicator · IND · %Share of individuals who used the Internet from any location and device in the last three months.
- Penduduk yang tercakup jaringan seluler, menurut teknologiIndicator · IND · %Share of the population within range of a mobile-cellular signal, reported separately for 2G, 3G, 4G/LTE and 5G; the headline value is 4G or better.
- Langganan pita lebar tetap per 100 pendudukIndicator · IND · /10*2Fixed subscriptions to the public Internet at advertised download speeds of at least 256 kbit/s, per 100 inhabitants, by speed tier.
- Redundansi rute konektivitas internasionalIndicator · IND · 1Number of physically diverse international connectivity routes (distinct subsea-cable landing stations and cross-border terrestrial fibre routes) serving the economy, capped at ten.
- Ketahanan jaringan listrikIndicator · IND · scoreTarget-defined score (0–1) combining transmission N-1 compliance, share of demand restorable within 24 hours after a major event, black-start capability and hardening of critical substations against flood, wind, heat and geomagnetic stress.
- Ketahanan jaringan pasokan airIndicator · IND · scoreTarget-defined score (0–1) combining non-revenue water, storage in days of average demand, source redundancy, back-up power at treatment and pumping sites, and planned restoration time after a major event.
- Fasilitas kritis dengan daya cadangan 72 jamIndicator · IND · %Share of hospitals, emergency operations centres, water and wastewater plants and telecom core sites with on-site back-up power and fuel for at least 72 hours of operation.
- Kesenjangan investasi infrastruktur, porsi terhadap PDBIndicator · IND · %Difference between the estimated annual investment needed to meet infrastructure service and resilience needs (energy, transport, water, telecom) and current-trend investment, as a percentage of GDP.
- Pemadaman listrik yang dialami perusahaan dalam sebulan biasaIndicator · IND · /moAverage number of electrical outages that formal private firms report in a typical month, from establishment surveys.
- Nilai yang hilang akibat pemadaman listrik, porsi terhadap penjualan perusahaanIndicator · IND · %Losses that firms attribute to power outages as a percentage of annual sales, from establishment surveys.
- Durasi rata-rata gangguan sistem (SAIDI)Indicator · IND · h/aTotal minutes of sustained supply interruption per customer served in the year, expressed in hours, as reported by distribution utilities under the IEEE 1366 convention.
- Frekuensi rata-rata gangguan sistem (SAIFI)Indicator · IND · /aNumber of sustained supply interruptions per customer served in the year, as reported by distribution utilities under the IEEE 1366 convention.
- Susut transmisi dan distribusi tenaga listrikIndicator · IND · %Electricity lost between generation and the consumer, technical and commercial, as a share of electricity output.
- Unit infrastruktur kritis yang rusak atau hancur akibat bencanaIndicator · IND · 1Number of critical infrastructure units and facilities (health, education, transport, utilities, other) damaged or destroyed by hazardous events in the year.
- Fasilitas kesehatan yang rusak atau hancur akibat bencanaIndicator · IND · 1Number of health facilities damaged or destroyed by hazardous events in the year.
- Fasilitas pendidikan yang rusak atau hancur akibat bencanaIndicator · IND · 1Number of educational facilities damaged or destroyed by hazardous events in the year.
- Gangguan layanan dasar yang disebabkan bencanaIndicator · IND · 1Number of disruption events to basic services (education, health, and other basic services such as water, power, transport, telecom and waste) caused by hazardous events in the year.
- Kerugian ekonomi langsung pada infrastruktur kritis, porsi terhadap PDBIndicator · IND · %Direct economic loss from damage to or destruction of critical infrastructure by hazardous events in the year, as a percentage of GDP.
- Jam gangguan internet berskala nasionalIndicator · IND · h/aTotal hours in the year during which measured national internet connectivity fell below half of its expected level, whether from shutdowns, cable cuts, power loss or attack.
- Transport connectivity deficit sub-indexSub-index · SUB · w 1 · 22.2%Composite of the lack of rural all-season road access, weak logistics performance, low liner shipping connectivity, low air connectivity and limited urban public transport, each inverted.
- Digital connectivity deficit sub-indexSub-index · SUB · w 1 · 22.2%Composite of the lack of internet use, mobile coverage, fixed broadband and international route redundancy, each inverted.
- Utility system fragility sub-indexSub-index · SUB · w 1 · 22.2%Composite of the lack of power-grid and water-network resilience and of back-up power at critical facilities, together with the infrastructure investment gap.
- Electricity supply unreliability sub-indexSub-index · SUB · w 1 · 22.2%Composite of firm-reported outages and sales losses, SAIDI, SAIFI and network losses.
- Infrastructure disruption impact sub-indexSub-index · SUB · w 0.5 · 11.1%Composite of disaster damage to critical infrastructure, health and education facilities, basic-service disruptions, economic loss to infrastructure and internet disruption hours, normalised over a ten-year rolling window.
- Indeks kerapuhan infrastrukturDomain index · IDX · geometricIndex of transport and digital connectivity deficits, utility fragility, energy supply unreliability and realised disruption impact on a 0–10 scale, higher meaning more fragile.
- Kerentanan manusia dan sistemPillar · PILLAR · 8 indicesHow susceptible are people, livelihoods, ecosystems and essential systems to harm when a shock arrives?
- NXS-GRX (canonical data, provenance and risk) Composite RiskComposite · COMPOSITE · four pillarsComposite = (HTE × VUL × MSF × LCC)^(1/4), each pillar on 0–10 floored at 0.1; pillar = expert-weighted geometric mean of its domain indices
Run this index’s own aggregation
Set each component, change the aggregation or the weight uncertainty, and watch the interval, the class probability and each component’s contribution respond.
Treatment, normalisation, weighting, aggregation, uncertainty
- Treatment
- WINSORISE
- Outlier rule
- |skew| > 2, kurtosis > 3.5
- Normalisation
- INFORM 0–10 rescaling
- Imputation
- NONE
- Coverage minimum
- 67% of components
- Modelled share cap
- 30% of weight
- Weighting
- ahli
- Aggregation
- geometric
- Scale
- 0 to 10
- Ketidakpastian
- 1,000 Monte Carlo runs over normalisation, weights, aggregation, imputation
- Framework basis
- OECD/JRC Handbook (2008); JRC COIN 10-step guide; Sendai Framework target D; UNDRR Principles for Resilient Infrastructure (2022)
5 components, 24 indicators
Transport connectivity deficit sub-index w 1
Composite of the lack of rural all-season road access, weak logistics performance, low liner shipping connectivity, low air connectivity and limited urban public transport, each inverted.
| Indikator | Unit | Bukti | Sumber | Proporsi |
|---|---|---|---|---|
Penduduk perdesaan dalam jarak 2 km dari jalan segala musimIND.INF.transport.rural_road_access | % | Class C | wb-rural-access-index, openstreetmap, worldpop | 33.3% |
Kinerja logistikIND.INF.transport.logistics_performance | {score} | Class E | wb-lpi | 22.2% |
Konektivitas pelayaran reguler relatif terhadap batas terbaikIND.INF.transport.liner_shipping_connectivity | % | Class B | unctad-lsci, wb-wdi | 22.2% |
Penumpang udara yang diangkut per kapitaIND.INF.transport.air_passengers.pc | {passengers}/a/{person} | Class B | icao-air-transport-reporting, wb-wdi | 11.1% |
Penduduk perkotaan dengan akses mudah ke transportasi umumIND.INF.transport.public_transport_access | % | Class C | un-habitat-urban-indicators-database, gtfs-feeds, openstreetmap | 11.1% |
Digital connectivity deficit sub-index w 1
Composite of the lack of internet use, mobile coverage, fixed broadband and international route redundancy, each inverted.
| Indikator | Unit | Bukti | Sumber | Proporsi |
|---|---|---|---|---|
Individu yang menggunakan internetIND.INF.digital.internet_users | % | Class B | itu-datahub, wb-wdi, national-ict-household-surveys | 33.3% |
Penduduk yang tercakup jaringan seluler, menurut teknologiIND.INF.digital.mobile_network_coverage | % | Class B | itu-datahub, gsma-mobile-coverage-maps | 33.3% |
Langganan pita lebar tetap per 100 pendudukIND.INF.digital.fixed_broadband | /10*2 | Class B | itu-datahub, wb-wdi, oecd-broadband-portal | 16.7% |
Redundansi rute konektivitas internasionalIND.INF.digital.international_connectivity_redundancy | 1 | Class D | telegeography-submarine-cable-map, itu-broadband-maps, peeringdb | 16.7% |
Utility system fragility sub-index w 1
Composite of the lack of power-grid and water-network resilience and of back-up power at critical facilities, together with the infrastructure investment gap.
| Indikator | Unit | Bukti | Sumber | Proporsi |
|---|---|---|---|---|
Ketahanan jaringan listrikIND.INF.utilities.power_grid_resilience | {score} | Class D | national-energy-regulators, transmission-system-operator-reports, entso-e-transparency | 25.0% |
Ketahanan jaringan pasokan airIND.INF.utilities.water_network_resilience | {score} | Class E | ibnet-water-utility-database, national-water-regulators, municipal-utility-reports | 25.0% |
Fasilitas kritis dengan daya cadangan 72 jamIND.INF.utilities.critical_facility_backup_power | % | Class E | who-health-facility-assessments, national-civil-protection-inspections | 25.0% |
Kesenjangan investasi infrastruktur, porsi terhadap PDBIND.INF.utilities.infrastructure_investment_gap.gdp | % | Class C | gi-hub-infrastructure-outlook, wb-ppi-database, imf-investment-and-capital-stock-dataset | 25.0% |
Electricity supply unreliability sub-index w 1
Composite of firm-reported outages and sales losses, SAIDI, SAIFI and network losses.
| Indikator | Unit | Bukti | Sumber | Proporsi |
|---|---|---|---|---|
Pemadaman listrik yang dialami perusahaan dalam sebulan biasaIND.ENE.reliability.firm_power_outages | /mo | Class B | wb-enterprise-surveys, wb-b-ready | 22.2% |
Nilai yang hilang akibat pemadaman listrik, porsi terhadap penjualan perusahaanIND.ENE.reliability.outage_sales_loss | % | Class B | wb-enterprise-surveys | 22.2% |
Durasi rata-rata gangguan sistem (SAIDI)IND.ENE.reliability.saidi | h/a | Class B | wb-b-ready, national-energy-regulators, ceer-benchmarking-report, us-eia-861 | 22.2% |
Frekuensi rata-rata gangguan sistem (SAIFI)IND.ENE.reliability.saifi | /a | Class B | wb-b-ready, national-energy-regulators, ceer-benchmarking-report, us-eia-861 | 22.2% |
Susut transmisi dan distribusi tenaga listrikIND.ENE.reliability.td_losses | % | Class B | iea-electricity-information, national-energy-regulators, wb-wdi | 11.1% |
Infrastructure disruption impact sub-index w 0.5
Composite of disaster damage to critical infrastructure, health and education facilities, basic-service disruptions, economic loss to infrastructure and internet disruption hours, normalised over a ten-year rolling window.
| Indikator | Unit | Bukti | Sumber | Proporsi |
|---|---|---|---|---|
Unit infrastruktur kritis yang rusak atau hancur akibat bencanaIND.INF.disruption.critical_infrastructure_damage | 1 | Class B | undrr-sendai-framework-monitor, desinventar | 22.2% |
Fasilitas kesehatan yang rusak atau hancur akibat bencanaIND.INF.disruption.health_facilities_damaged | 1 | Class B | undrr-sendai-framework-monitor, who-health-resources-availability-monitoring | 11.1% |
Fasilitas pendidikan yang rusak atau hancur akibat bencanaIND.INF.disruption.education_facilities_damaged | 1 | Class B | undrr-sendai-framework-monitor, gadrrres-comprehensive-school-safety | 11.1% |
Gangguan layanan dasar yang disebabkan bencanaIND.INF.disruption.basic_service_disruptions | 1 | Class C | undrr-sendai-framework-monitor | 22.2% |
Kerugian ekonomi langsung pada infrastruktur kritis, porsi terhadap PDBIND.INF.disruption.critical_infrastructure_loss.gdp | % | Class C | undrr-sendai-framework-monitor, wb-gfdrr-pdna-reports | 22.2% |
Jam gangguan internet berskala nasionalIND.INF.digital.internet_disruption_hours | h/a | Class D | ioda-georgia-tech, cloudflare-radar, access-now-keepiton | 11.1% |
Infrastruktur
Critical infrastructure stock, condition, service continuity, connectivity and urban systems.
| Sub-domain | Indikator |
|---|---|
| Transportasi | 6 |
| Digital connectivity | 5 |
| Utilities | 7 |
| Urban systems | 1 |
| Service disruption | 5 |
Anchor frameworks (pillar structure and definitions only): Sendai D; ISO 37120 / 37122 / 37123.
All 24 infrastructure indicators
| Indikator | Domain | Sub-domain | Komponen | Unit | Tingkat | Crosswalks |
|---|---|---|---|---|---|---|
Penduduk perdesaan dalam jarak 2 km dari jalan segala musimIND.INF.transport.rural_road_access | INF | Transportasi | kapasitas penanggulangan | % | COUNTRY, ADM1 | SDG 9.1.1 |
Kinerja logistikIND.INF.transport.logistics_performance | INF | Transportasi | kapasitas penanggulangan | {score} | COUNTRY | WB_WDI LP.LPI.OVRL.XQ |
Konektivitas pelayaran reguler relatif terhadap batas terbaikIND.INF.transport.liner_shipping_connectivity | INF | Transportasi | kapasitas penanggulangan | % | COUNTRY | WB_WDI IS.SHP.GCNW.XQ |
Penumpang udara yang diangkut per kapitaIND.INF.transport.air_passengers.pc | INF | Transportasi | kapasitas penanggulangan | {passengers}/a/{person} | COUNTRY | WB_WDI IS.AIR.PSGR |
Penduduk perkotaan dengan akses mudah ke transportasi umumIND.INF.transport.public_transport_access | INF | Transportasi | kapasitas penanggulangan | % | CITY, ADM1, COUNTRY | SDG 11.2.1 ISO_37120 ISO 37120:2018 |
Jaringan jalan dan rel di zona bahaya tinggi, porsiIND.INF.transport.network_exposed.share | INF | Transportasi | keterpaparan | % | COUNTRY, ADM1, ADM2, CITY, GRID | |
Individu yang menggunakan internetIND.INF.digital.internet_users | INF | Digital connectivity | kapasitas penanggulangan | % | COUNTRY, ADM1, CITY | SDG 17.8.1 WB_WDI IT.NET.USER.ZS |
Penduduk yang tercakup jaringan seluler, menurut teknologiIND.INF.digital.mobile_network_coverage | INF | Digital connectivity | kapasitas penanggulangan | % | COUNTRY, ADM1 | SDG 9.c.1 |
Langganan pita lebar tetap per 100 pendudukIND.INF.digital.fixed_broadband | INF | Digital connectivity | kapasitas penanggulangan | /10*2 | COUNTRY, ADM1 | SDG 17.6.1 WB_WDI IT.NET.BBND.P2 |
Redundansi rute konektivitas internasionalIND.INF.digital.international_connectivity_redundancy | INF | Digital connectivity | kapasitas penanggulangan | 1 | COUNTRY | |
Jam gangguan internet berskala nasionalIND.INF.digital.internet_disruption_hours | INF | Digital connectivity | impact | h/a | COUNTRY | |
Ketahanan jaringan listrikIND.INF.utilities.power_grid_resilience | INF | Utilities | kapasitas penanggulangan | {score} | COUNTRY, ADM1, CITY | ISO_37123 ISO 37123:2019 |
Ketahanan jaringan pasokan airIND.INF.utilities.water_network_resilience | INF | Utilities | kapasitas penanggulangan | {score} | COUNTRY, ADM1, CITY | ISO_37123 ISO 37123:2019 |
Fasilitas kritis dengan daya cadangan 72 jamIND.INF.utilities.critical_facility_backup_power | INF | Utilities | kapasitas penanggulangan | % | COUNTRY, ADM1, CITY | ISO_37123 ISO 37123:2019 |
Aset pasokan air di zona bahaya tinggi, porsiIND.INF.utilities.water_assets_exposed.share | INF | Utilities | keterpaparan | % | COUNTRY, ADM1, ADM2, CITY, GRID | |
Aset pembangkit dan jaringan listrik di zona bahaya tinggi, porsiIND.INF.utilities.power_assets_exposed.share | INF | Utilities | keterpaparan | % | COUNTRY, ADM1, ADM2, CITY, GRID | |
Fasilitas vital di zona bahaya tinggi, porsiIND.INF.utilities.lifeline_facilities_exposed.share | INF | Utilities | keterpaparan | % | COUNTRY, ADM1, ADM2, CITY, GRID | |
Kesenjangan investasi infrastruktur, porsi terhadap PDBIND.INF.utilities.infrastructure_investment_gap.gdp | INF | Utilities | vulnerability | % | COUNTRY | |
City electricity interruption hours per customerIND.INF.urban.power_interruption_hours | INF | Urban systems | vulnerability | h/a | CITY | ISO_37120 ISO 37120:2018 |
Unit infrastruktur kritis yang rusak atau hancur akibat bencanaIND.INF.disruption.critical_infrastructure_damage | INF | Service disruption | impact | 1 | COUNTRY, ADM1 | SENDAI D-1 SDG 11.5.2 |
Fasilitas kesehatan yang rusak atau hancur akibat bencanaIND.INF.disruption.health_facilities_damaged | INF | Service disruption | impact | 1 | COUNTRY, ADM1 | SENDAI D-2 |
Fasilitas pendidikan yang rusak atau hancur akibat bencanaIND.INF.disruption.education_facilities_damaged | INF | Service disruption | impact | 1 | COUNTRY, ADM1 | SENDAI D-3 |
Gangguan layanan dasar yang disebabkan bencanaIND.INF.disruption.basic_service_disruptions | INF | Service disruption | impact | 1 | COUNTRY, ADM1 | SENDAI D-5 |
Kerugian ekonomi langsung pada infrastruktur kritis, porsi terhadap PDBIND.INF.disruption.critical_infrastructure_loss.gdp | INF | Service disruption | impact | % | COUNTRY, ADM1 | SENDAI C-5 |
Infrastructure fragility index, world
The world reading of this index, every country as a tile and the largest movements since the previous edition.
- Edisi sebelumnya
- –
- Range since 2016
- –
- Komposit terkait
- –
- Skor keterkaitan S
- –
- Pulse, minggu terakhir
- –
- Outlook, 12 months
- –
- Metode
- Indicator Standard 1.0 · NXS-GRX 2026
- Sampel
- 1,000
Belum ada nilai yang diterbitkan. Edisi pertama menggambar riwayat di sini dengan pita interval dan batas kelas.
Country values
- Ubin peta
/api/v1/public/grix/risk-products/tiles/inf/{z}/{x}/{y}.mvt- Kunci observasi
nis:IDX.INF.disruption.infrastructure_fragility:{ISO3}:{YEAR}:A
Series that read this index
Crosswalks and validity checks
Crosswalks map leaf indicators to source code lists; established indices are used for validity checks, never re-weighted as inputs.
| Code system | Leaf indicators mapped |
|---|---|
WB_WDI | 8 |
SDG | 6 |
SENDAI | 5 |
ISO_37120 | 3 |
ISO_37123 | 3 |
Platforms, standards and ways to take part
Field and service platforms of GCRI, GRF and GRA, the Nexus Risk Standards for this domain, learning, working groups and open calls. Every link is a live page.
Di seluruh Nexus
GCRI Trade and Strategic Resources · Food Nexus · GCRI Advanced Industry and Robotics.
Kutip dan gunakan kembali
See this index in every country profile
Each profile shows this index with its interval and class once released.
Status
Metodologi, struktur, dan definisi The Global Risks Index merupakan draf kerja persiapan (2026), yang diedarkan untuk ditinjau dan dikomentari, bukan untuk diterapkan. Tidak ada nilai yang ditampilkan sampai sebuah edisi dirilis dari pemotongan bukti yang diatur; nilai-nilai tersebut kemudian memuat interval, kelas, sumber, dan jalur koreksinya. Simulator menjalankan metode yang diterbitkan pada angka yang Anda pilih dan tidak pernah menampilkan nilai NXS-GRX.
Apa yang bukan NXS-GRX
NXS-GRX adalah informasi riset dan analitik risiko. NXS-GRX bukan peringkat kredit atau ESG dan tidak memakai skala peringkat, bukan acuan untuk instrumen keuangan, bukan statistik resmi, bukan peringatan darurat atau klasifikasi resmi, dan bukan nasihat. NXS-GRX tidak boleh digunakan untuk menilai orang perseorangan. Kelas risiko adalah pita pada skala yang diterbitkan, tidak pernah peringkat negara atau orang.
Lembaga dan sumber
The Nexus Consortium is stewarded by three independent not-for-profit institutions: The Global Centre for Risk and Innovation (GCRI), through GCRI US in Washington, DC and GCRI Canada in Ontario, with GCRI Canada as Lead Institution, Consortium Secretariat and lead contracting organisation; The Global Risks Forum (GRF); and The Global Risks Alliance (GRA). Technology, infrastructure and service providers work with the Consortium at arm’s length under written agreements, like every other external party in the public-private-planet model, and hold no role in its stewardship.
Setiap nilai memuat atribusi sumbernya, yang tetap memiliki lisensinya masing-masing. Nama-nama eksternal dikutip semata-mata untuk interoperabilitas. Teks yang disusun Nexus direncanakan berlisensi CC BY 4.0 saat dirilis.
Avis en français
La méthodologie et les définitions du NXS-GRX sont un projet de travail préparatoire (2026). Le NXS-GRX est une information de recherche et d’analyse des risques : ni notation, ni indice de référence financier, ni statistique officielle, ni alerte, ni conseil. Les classes de risque sont des bandes sur une échelle publiée, non des classements.