Editions and changes
Baseline Edition 2026: evidence close 2026-09-30, method v1.0.0-draft. No value is published until an edition is released.
Edition list
Methodology and page structure are fixed for review; values publish only when an edition is released from a governed evidence cut.
| 版 | 識別子 | エビデンス締め切り | 手法 | ステータス |
|---|---|---|---|---|
| ベースライン版 2026 | GRIX-2026-BASELINE | 2026-09-30 | v1.0.0-draft | Fixed for review; no values published |
How a value moves to release
Each edition passes method review, data and licence review, the public-safe screen and steward review before any value is published.
Method changes and corrections
The rules are on governance.
A method change is proposed, consulted on for at least 30 days, answered, versioned and announced before it takes effect. A correction creates a new vintage and keeps the earlier one retrievable. No method change or correction has been released yet, because no edition has been released; each will be listed here with its date and version.
誤りを報告する
Every correction is reviewed in public and logged with its effect on each value.
ステータス
The Global Risks Index の手法、構造、定義は準備段階の作業草案(2026 年)であり、レビューと意見募集のために配布されているもので、実施を目的としたものではありません。管理されたエビデンスの区切りから版が公表されるまで、値は一切表示されません。公表後の値には、区間、区分、出典、訂正の経路が付されます。シミュレーターは、公表された手法をあなたが選んだ数値で実行するものであり、NXS-GRX の値を表示することはありません。
NXS-GRX ではないもの
NXS-GRX は研究およびリスク分析の情報です。信用格付や ESG 格付ではなく、格付尺度を用いず、金融商品のベンチマークでも、公的統計でも、緊急警報や公式分類でも、助言でもありません。自然人の評価に用いてはなりません。リスククラスは公開された尺度上の区分であり、国や人の順位付けではありません。
機関と情報源
The Nexus Consortium is stewarded by three independent not-for-profit institutions: The Global Centre for Risk and Innovation (GCRI), through GCRI US in Washington, DC and GCRI Canada in Ontario, with GCRI Canada as Lead Institution, Consortium Secretariat and global contracting party; The Global Risks Forum (GRF); and The Global Risks Alliance (GRA). Technology, infrastructure and service providers work with the Consortium at arm's length under written agreements, like every other external party in the public-private-planet model, and hold no role in its stewardship.
Every value carries the attribution of its sources, which keep their own licences. External names are cited for interoperability only. Text and figures by the Index: CC BY 4.0 on release. Open-data compilations in tables and downloads: CC BY 4.0. Every source keeps its own licence, shown beside it.
Avis en français
La méthodologie et les définitions du NXS-GRX sont un projet de travail préparatoire (2026). Le NXS-GRX est une information de recherche et d'analyse des risques : ni notation, ni indice de référence financier, ni statistique officielle, ni alerte, ni conseil. Les classes de risque sont des bandes sur une échelle publiée, non des classements.