Editions and changes
Baseline Edition 2026: evidence close 2026-09-30, method v1.0.0-draft. No value is published until an edition is released.
Edition list
Methodology and page structure are fixed for review; values publish only when an edition is released from a governed evidence cut.
| ایڈیشن | Identifier | شواہد کی آخری تاریخ | طریقہ | حیثیت |
|---|---|---|---|---|
| بنیادی ایڈیشن 2026 | GRIX-2026-BASELINE | 2026-09-30 | v1.0.0-draft | Fixed for review; no values published |
How a value moves to release
Each edition passes method review, data and licence review, the public-safe screen and steward review before any value is published.
Method changes and corrections
The rules are on governance.
A method change is proposed, consulted on for at least 30 days, answered, versioned and announced before it takes effect. A correction creates a new vintage and keeps the earlier one retrievable. No method change or correction has been released yet, because no edition has been released; each will be listed here with its date and version.
Report an error
Every correction is reviewed in public and logged with its effect on each value.
حیثیت
The Global Risks Index کا طریقۂ کار، ساخت اور تعریفیں ایک ابتدائی ورکنگ مسودہ (2026) ہیں، جو جائزے اور تبصرے کے لیے گردش میں ہیں، نفاذ کے لیے نہیں۔ کوئی قدر اس وقت تک ظاہر نہیں ہوتی جب تک کسی منظم شواہد کی کٹوتی سے ایڈیشن جاری نہ ہو؛ تب اقدار وقفے، درجے، ماخذ اور اپنا تصحیحی راستہ رکھتی ہیں۔ سمیولیٹرز شائع شدہ طریقے آپ کے منتخب کردہ اعداد پر چلاتے ہیں اور کبھی NXS-GRX قدر نہیں دکھاتے۔
NXS-GRX کیا نہیں ہے
NXS-GRX تحقیقی اور خطرے کے تجزیاتی معلومات ہے۔ یہ قرض یا ESG ریٹنگ نہیں اور کوئی ریٹنگ پیمانہ استعمال نہیں کرتا، مالی آلات کے لیے معیار نہیں، سرکاری شماریات نہیں، ہنگامی انتباہ یا سرکاری درجہ بندی نہیں، اور مشورہ نہیں۔ اسے قدرتی افراد کی جانچ کے لیے استعمال نہیں کیا جانا چاہیے۔ خطرے کے درجے شائع شدہ پیمانے پر حدود ہیں، کبھی ممالک یا لوگوں کی درجہ بندی نہیں۔
ادارے اور ماخذ
The Nexus Consortium is stewarded by three independent not-for-profit institutions: The Global Centre for Risk and Innovation (GCRI), through GCRI US in Washington, DC and GCRI Canada in Ontario, with GCRI Canada as Lead Institution, Consortium Secretariat and global contracting party; The Global Risks Forum (GRF); and The Global Risks Alliance (GRA). Technology, infrastructure and service providers work with the Consortium at arm's length under written agreements, like every other external party in the public-private-planet model, and hold no role in its stewardship.
Every value carries the attribution of its sources, which keep their own licences. External names are cited for interoperability only. Text and figures by the Index: CC BY 4.0 on release. Open-data compilations in tables and downloads: CC BY 4.0. Every source keeps its own licence, shown beside it.
Avis en français
La méthodologie et les définitions du NXS-GRX sont un projet de travail préparatoire (2026). Le NXS-GRX est une information de recherche et d'analyse des risques : ni notation, ni indice de référence financier, ni statistique officielle, ni alerte, ni conseil. Les classes de risque sont des bandes sur une échelle publiée, non des classements.