Editions and changes
Baseline Edition 2026: evidence close 2026-09-30, method v1.0.0-draft. No value is published until an edition is released.
Edition list
Methodology and page structure are fixed for review; values publish only when an edition is released from a governed evidence cut.
| Edisi | Identifier | Batas akhir bukti | Metode | Status |
|---|---|---|---|---|
| Edisi Dasar 2026 | GRIX-2026-BASELINE | 2026-09-30 | v1.0.0-draft | Fixed for review; no values published |
How a value moves to release
Each edition passes method review, data and licence review, the public-safe screen and steward review before any value is published.
Method changes and corrections
The rules are on governance.
A method change is proposed, consulted on for at least 30 days, answered, versioned and announced before it takes effect. A correction creates a new vintage and keeps the earlier one retrievable. No method change or correction has been released yet, because no edition has been released; each will be listed here with its date and version.
Laporkan kesalahan
Every correction is reviewed in public and logged with its effect on each value.
Status
Metodologi, struktur, dan definisi The Global Risks Index merupakan draf kerja persiapan (2026), yang diedarkan untuk ditinjau dan dikomentari, bukan untuk diterapkan. Tidak ada nilai yang ditampilkan sampai sebuah edisi dirilis dari pemotongan bukti yang diatur; nilai-nilai tersebut kemudian memuat interval, kelas, sumber, dan jalur koreksinya. Simulator menjalankan metode yang diterbitkan pada angka yang Anda pilih dan tidak pernah menampilkan nilai NXS-GRX.
Apa yang bukan NXS-GRX
NXS-GRX adalah informasi riset dan analitik risiko. NXS-GRX bukan peringkat kredit atau ESG dan tidak memakai skala peringkat, bukan acuan untuk instrumen keuangan, bukan statistik resmi, bukan peringatan darurat atau klasifikasi resmi, dan bukan nasihat. NXS-GRX tidak boleh digunakan untuk menilai orang perseorangan. Kelas risiko adalah pita pada skala yang diterbitkan, tidak pernah peringkat negara atau orang.
Lembaga dan sumber
The Nexus Consortium is stewarded by three independent not-for-profit institutions: The Global Centre for Risk and Innovation (GCRI), through GCRI US in Washington, DC and GCRI Canada in Ontario, with GCRI Canada as Lead Institution, Consortium Secretariat and global contracting party; The Global Risks Forum (GRF); and The Global Risks Alliance (GRA). Technology, infrastructure and service providers work with the Consortium at arm's length under written agreements, like every other external party in the public-private-planet model, and hold no role in its stewardship.
Every value carries the attribution of its sources, which keep their own licences. External names are cited for interoperability only. Text and figures by the Index: CC BY 4.0 on release. Open-data compilations in tables and downloads: CC BY 4.0. Every source keeps its own licence, shown beside it.
Avis en français
La méthodologie et les définitions du NXS-GRX sont un projet de travail préparatoire (2026). Le NXS-GRX est une information de recherche et d'analyse des risques : ni notation, ni indice de référence financier, ni statistique officielle, ni alerte, ni conseil. Les classes de risque sont des bandes sur une échelle publiée, non des classements.