Skip to content

The Global Risks Index

The Global Risks Index solutions · Public sector

Cidades e operadores de infraestrutura

Read hexagon-level hazard and dependency layers for planning, investment and continuity.

Página GRX-SOL-CITIESEdição Edição de referência 2026Fecho das evidências 2026-09-30Valores ainda não publicadosMétodo v1.0.0-draft
on: studio project created · Build a custom index in Index Studio9 jobs · 2 gates · 5 checks
  1. Define scope and question instant
  2. Select indicators self-serve
  3. Licence and coverage gate automatic
  4. Harmonise and impute 1 hour
  5. Normalise, weight and aggregate self-serve
  6. Uncertainty: 1,000 draws 1 hour
  7. Validation suite 1 hour
  8. Method review 5 days
  9. Publish to your tenant instant

01Need

What this solution does

Read hexagon-level hazard and dependency layers for planning, investment and continuity.

Prioritise prevention and preparedness

Plan with subnational layers

Track Sendai targets

Codesenvolver um índice nacional

02Featured run

Crie um índice personalizado no Index Studio

Compose an index for a portfolio, sector, city or supply chain on the Indicator Standard grammar, with the same uncertainty, tests and provenance as NXS-GRX (canonical data, provenance and risk) itself.

on: studio project created

Crie um índice personalizado no Index Studio

In progressTriggered by You9 jobs2 approval gates2 matrix jobs5 checks1 deployment

Grafo
01Escopo
02Escopo
03Dados
04Dados
05Construct
06Construct
07Teste
08Teste
09Ship

100%
Linha do tempo
Job0 d1 d2 d3 d4 d5 dTarget
Define scope and questionYouinstant
Select indicatorsYouinstant
Licence and coverage gateNXS-GRX run serviceinstant
Harmonise and imputeNXS-GRX run service1 h
Normalise, weight and aggregateYouinstant
Uncertainty: 1,000 drawsMonte Carlo engine1 h
Validation suiteNXS-GRX run service1 h
Method reviewIndex editors5 d
Publish to your tenantNXS-GRX Platforminstant

End to end on the longest path: about 5.1 d of proposed target service levels. Gates wait for the people named; bars with a fading end have no fixed length.

Etapas
  1. Define scope and question

    Scope · You · instant
    Entities: countries, ADM areas, sites or assets · Question and decision the index serves · Risk-chain components to cover
    Index Studio
  2. Select indicators

    Scope · You · self-serve
    Search 451 indicator definitions · Add your own indicators · Polarity and unit checked
    Index Studioindicator standard
  3. Licence and coverage gate approval

    Data · NXS-GRX run service · automatic
    Each input’s licence checked for the use · Coverage per entity measured · Gaps flagged, never zero-filled
    Registro de licençasRegistro PostgreSQL (segurança em nível de linha)
  4. Harmonise and impute matrix · indicators × entities

    Data · NXS-GRX run service · 1 hour
    Units and periods aligned · Flagged imputation only at indicator level
    Serviço de execução NXS-GRXpadrão de indicadores
  5. Normalise, weight and aggregate

    Construct · You · self-serve
    Normalisation per indicator · Expert or statistical weights · Geometric, arithmetic or penalised aggregation
    Index StudioTested model kernels
  6. Uncertainty: 1,000 draws matrix · 1,000 draws

    Construct · Monte Carlo engine · 1 hour
    Weights, normalisation and imputation varied · 90% intervals and class probabilities
    Motor Monte Carlo
  7. Validation suite

    Test · NXS-GRX run service · 1 hour
    Internal coherence · Sensitivity (Sobol) · Correlation with established indices · Leave-one-out stability
    Verification engineTested model kernels
  8. Revisão do método aprovação

    Test · Index editors · 5 days
    Method and tests reviewed · Disposition recorded
    Registro PostgreSQL (segurança em nível de linha)
  9. Publish to your tenant

    Ship · NXS-GRX Platform · instant
    API endpoint and tiles · Dashboard and embeds · Model card
    Private tenant (row-level security)Public cut APIVector tiles
Artefatos
Artefato Tarefa Quem Etapa
Studio project Define scope and question Você Escopo
Indicator set Select indicators Você Escopo
Coverage report Licence and coverage gate Serviço de execução NXS-GRX Dados
Harmonised panel Harmonise and impute Serviço de execução NXS-GRX Dados
Method record Normalise, weight and aggregate Você Construct
Draws file with seed Uncertainty: 1,000 draws Motor Monte Carlo Construct
Relatório de validação Validation suite Serviço de execução NXS-GRX Teste
Review note Revisão do método Editores do índice Teste
Index endpoint Publish to your tenant NXS-GRX Platform Ship
Model card Publish to your tenant NXS-GRX Platform Ship
ConcluídoEm cursoAguardando aprovaçãoQueuedApproval gateMatrix jobTest jobDeploymentYou are here
Compose an index for a portfolio, sector, city or supply chain on the Indicator Standard grammar, with the same uncertainty, tests and provenance as NXS-GRX itself. The canvas shows where a request stands at the marked job; it is illustrative, not the status of a real request. Durations are proposed target service levels. Select a job for its steps, the people who act, the technology it runs on and what it produces.
05Séries

Series most read

GLBGlobal SystemsThe state of interdependent global risk: the twenty domain indices aggregated to the world, the five core systems (water, energy, food, health, biodiversity) and their couplings, the global tail register and the gap between perceived and measured risk. GS-01Global WaterAccess, scarcity, quality, floods and droughts, groundwater depletion, transboundary dependency and the couplings of water to energy, food, health and nature. GS-02Global EnergySupply adequacy, import dependency, grid reliability, affordability, extreme-weather exposure, critical minerals and transition pathways. GS-03Global Food and agrifoodAcute and chronic food insecurity, production shocks, import dependency, prices, fertiliser and logistics chokepoints, nutrition and pollination dependency. GS-04Global HealthHealth security capacity, epidemic emergence and spread, heat and air-quality burden, health system stress and access. GS-05Global Finance and economyFiscal and public debt risk, financial stability, external dependence, inflation and growth at risk, and the macro-financial channels of physical and transition risk. GS-06Global DevelopmentPoverty, inequality, human development, demographic pressure and displacement as the ground on which shocks become losses. GS-07Global ClimateChronic and acute physical climate hazard, transition exposure, adaptation gaps and scenario pathways to 2030, 2050 and 2100. GS-08Global DisasterMulti-hazard exposure, disaster losses and mortality, return-period losses, protection gaps and coping capacity.

Talk to the Secretariat

Enterprise, public-sector and sovereign work is agreed with GCRI Canada.