Multilaterals and development banks
Screen country and project context, read fiscal resilience and protection gaps, and design pre-arranged finance.
- Choose the scenario family instant
- Configure shocks and horizon self-serve
- Model runs 3 hours
- Coupling propagation 1 hour
- Tail and exceedance 1 hour
- Results and drivers instant
- Analyst sign-off 2 days
What this solution does
Screen country and project context, read fiscal resilience and protection gaps, and design pre-arranged finance.
Screen country and project context
Read fiscal resilience and protection gaps
Design pre-arranged finance questions
Run a scenario or stress test
Configure a pathway or a structured shock, run it across entities and draws in Model Lab, propagate it through the coupling network and read the tails.
Run a scenario or stress test
End to end on the longest path: about 2.2 d of proposed target service levels. Gates wait for the people named; bars with a fading end have no fixed length.
-
Choose the scenario familyDesign · You · instantWarming, socio-economic or transition families · Or a structured shock: fiscal, compound hazard, supplyModel Lab
-
Configure shocks and horizonDesign · You · self-serveShock size, timing and entry points · Horizon to 2030, 2050 or 2100Model LabTested model kernels
-
Model runs matrix · entities × scenarios × drawsRun · Model Lab · 3 hoursKernels from the method library · Seeds recorded per runModel LabTested model kernelsMonte Carlo engine
-
Coupling propagationPropagate · Dependency network · 1 hourDebtRank and threshold cascades · Cross-border spilloversDependency networkTested model kernels
-
Tail and exceedancePropagate · Model Lab · 1 hourExceedance curves · 1-in-100 and 1-in-250 losses · Expected shortfallMonte Carlo engine
-
Results and driversRead · You · instantFan charts against class bounds · Driver decomposition · Export with citationModel LabProvenance (W3C PROV)
-
Analyst sign-off approvalRead · Your reviewer · 2 daysAssumptions and limits recordedPostgreSQL ledger (row-level security)
| Artefact | Job | Who | Hatua |
|---|---|---|---|
| Scenario spec | Choose the scenario family | You | Design |
| Run configuration | Configure shocks and horizon | You | Design |
| Run record with seed and digest | Model runs | Model Lab | Run |
| Cascade paths | Coupling propagation | Dependency network | Propagate |
| Tail report | Tail and exceedance | Model Lab | Propagate |
| Results pack | Results and drivers | You | Read |
| Sign-off | Analyst sign-off | Your reviewer | Read |
Every journey in this solution
Run a scenario or stress test
Configure a pathway or a structured shock, run it across entities and draws in Model Lab, propagate it through the coupling network and read the tails. 7 jobs · 1 gate.
Open the run
NXS-GRX Data · ScaleScreen a portfolio or supply chain
Locations, assets, suppliers or sovereign exposures matched and overlaid with hazard, country and coupling layers, then read as a portfolio posture. 6 jobs · 3 checks.
Open the run
Models of the Index · ModelDesign a parametric trigger
Study an index trigger for pre-arranged finance: event history, basis risk and calibration, with review before any use. Information for design, not advice. 6 jobs · 1 gate · 5 checks.
Open the run
Products and services
Series most read
Talk to the Secretariat
Enterprise, public-sector and sovereign work is agreed with GCRI Canada.
Hali
The methodology, structure and definitions of The Global Risks Index are a preparatory working draft (2026), circulated for review and comment and not for implementation. No value appears until an edition is released from a governed evidence cut; values then carry intervals, classes, sources and their correction pathway. Simulators run the published methods on numbers you choose and never show a NXS-GRX value.
NXS-GRX si nini
NXS-GRX ni taarifa ya utafiti na uchambuzi wa hatari. Si daraja la mikopo wala la ESG na haitumii kipimo chochote cha daraja, si kigezo cha vyombo vya fedha, si takwimu rasmi, si onyo la dharura wala uainishaji rasmi, na si ushauri. Haipaswi kutumiwa kutathmini watu binafsi. Madaraja ya hatari ni mikanda kwenye kipimo kilichochapishwa, kamwe si mpangilio wa nchi au watu.
Ishara za Pulse na uwezekano wa mtazamo ni taarifa za kukaguliwa na mamlaka husika, kamwe si maonyo ya umma; maonyo rasmi hutoka tu kwa mamlaka zilizopewa jukumu.
Taasisi na vyanzo
The Nexus Consortium is stewarded by three independent not-for-profit institutions: The Global Centre for Risk and Innovation (GCRI), through GCRI US in Washington, DC and GCRI Canada in Ontario, with GCRI Canada as Lead Institution, Consortium Secretariat and lead contracting organisation; The Global Risks Forum (GRF); and The Global Risks Alliance (GRA). Technology, infrastructure and service providers work with the Consortium at arm’s length under written agreements, like every other external party in the public-private-planet model, and hold no role in its stewardship.
Every value carries the attribution of its sources, which keep their own licences. External names are cited for interoperability only. Nexus-authored text is intended for CC BY 4.0 on release.
Avis en français
La méthodologie et les définitions du NXS-GRX sont un projet de travail préparatoire (2026). Le NXS-GRX est une information de recherche et d’analyse des risques : ni notation, ni indice de référence financier, ni statistique officielle, ni alerte, ni conseil. Les classes de risque sont des bandes sur une échelle publiée, non des classements.